Eco~tech Systems Environmental Ltd. Logo
Conway Centre Reed Bed Treatment System - Project carried out by Eco~tech Systems in Anglesey. Finished work.

Conway Centre Reed Bed Treatment System

Anglesey

Project focus


End User: The Conway Centre

Surface Treatment Area: Approx 450m²

Value: £475,000

Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo
Conway Centre Reed Bed Treatment System - Case Study Photo

Conway Centre Reed Bed Treatment System


The Conway Centre occupies 170 acres of National Trust parkland and gardens which extend down to the Menai Strait and include a Private Dock, Adventure Playground, Tipi, Playing Fields, Natural Ponds, Sheltered Shoreline and Mature Woodlands.

The site has over 300 beds and it was of paramount importance that the welfare of the resident staff and also the staff and pupils that visited the centre throughout the duration of the contract was uppermost on our agenda.

Correspondence were sent out to all suppliers and sub-contractors that had been carefully selected to assist with the works, informing them of the strict site speed limit, the route to the temporary site office and compound, and the extreme caution that should be taken whilst travelling through the grounds.

Prior to works commencing, several meetings took place with senior management from the centre, their environmental consultants, representatives from the National Trust, local authority Tree Officers and centre grounds staff. All of this careful planning ensured that the contract ran smoothly throughout, and without incident.

All parties concerned were delighted with the high quality end product, the care and consideration that was given to the surrounding environment whilst working in National Trust grounds and the attention to the Health & Safety considerations that were put in place when working in such a highly populated site.

Read more about us here and about Reed Beds here and here.
If you would like us to take care of your project – drop us a line or give us a call. Here’s our contact information.


ISO Certification Logo - Certificate Number 12964, ISO 9001, ISO 14001
Logo of Cumbria Chamber of Commerce
Logo of CHAS - the UK’s leading accreditation scheme for contractors
SafeContractor Accreditation
STROMA Accreditation Logo
Logo of Constructed Wetland Association
ISO Certification Logo - Certificate Number 12964, ISO 9001, ISO 14001
Logo of Cumbria Chamber of Commerce
Logo of CHAS - the UK’s leading accreditation scheme for contractors
SafeContractor Accreditation
STROMA Accreditation Logo
Logo of Constructed Wetland Association
ISO Certification Logo - Certificate Number 12964, ISO 9001, ISO 14001
Logo of Cumbria Chamber of Commerce